PUTRI, NABILA MEIHANA SYAM (2025) ANALISIS PENETAPAN EXPECTED APPROACH TIME PADA PESAWAT ARRIVAL RUNWAY 04 TERHADAP KELANCARAN LALU LINTAS PENERBANGAN DI PERUM LPPNPI CABANG AMBON. [Laporan OJT] (Unpublished)
30322021-OJT_2.pdf
Download (4MB)
| Item Type: | Laporan OJT |
|---|---|
| Subjects: | A General Works > AC Collections. Series. Collected works |
| Divisions: | D III Lalu Lintas Udara |
| Depositing User: | Unnamed user with email kharismatulfazarina@gmail.com |
| Date Deposited: | 19 Jan 2026 08:26 |
| Last Modified: | 19 Jan 2026 08:26 |
| URI: | https://repo.poltekbangsby.ac.id/id/eprint/2339 |
