ANALISIS PENETAPAN EXPECTED APPROACH TIME PADA PESAWAT ARRIVAL RUNWAY 04 TERHADAP KELANCARAN LALU LINTAS PENERBANGAN DI PERUM LPPNPI CABANG AMBON

PUTRI, NABILA MEIHANA SYAM (2025) ANALISIS PENETAPAN EXPECTED APPROACH TIME PADA PESAWAT ARRIVAL RUNWAY 04 TERHADAP KELANCARAN LALU LINTAS PENERBANGAN DI PERUM LPPNPI CABANG AMBON. [Laporan OJT] (Unpublished)

[thumbnail of 30322021-OJT_2.pdf] Text
30322021-OJT_2.pdf

Download (4MB)
Item Type: Laporan OJT
Subjects: A General Works > AC Collections. Series. Collected works
Divisions: D III Lalu Lintas Udara
Depositing User: Unnamed user with email kharismatulfazarina@gmail.com
Date Deposited: 19 Jan 2026 08:26
Last Modified: 19 Jan 2026 08:26
URI: https://repo.poltekbangsby.ac.id/id/eprint/2339

Actions (login required)

View Item
View Item